Rocklea to Darra: BIM Management with 12d Synergy

Rocklea to Darra BIM management webinar

Session Overview

With over 80,000 vehicles a day and an extremely narrow design corridor, the Ipswich Motorway Upgrade Project: Rocklea to Darra – Stage 1, was always going to be a challenge. But the BG&E and Cardno Design Joint Venture (DJV) were further tasked with delivering the first design and construct project to fully integrate and manage Building Information Modelling (BIM) in Queensland, Australia – and do so on a demanding deadline. In this session, Stuart Cook of BG&E describes how they were able to overcome these challenges, deliver a detailed BIM design, and fundamentally change the way they collaborate with 12d Synergy’s Common Data Environment.

What You’ll Learn:

An overview of the Rocklea to Darra Ipswich Motorway project
Key challenges the team faced
How they were able to successfully pilot BIM
Examples of success enabled through the combination of 12d Synergy, 12d Model, and BIM

About the Presenters

Stuart Cook
Stuart Cook
Queensland Transport Lead
BG&E

Stuart Cook leads BG&E’s Queensland Transport team, specialising in Design Management on projects valued up to $200M, including the first project to fully integrate BIM in Queensland, Australia. He has extensive experience as the interface between Road Authorities and Construction Contractors on major design and construct projects, and serves as Deputy Chair for Roads Australia.

Session Details

Duration:

23 minutes

Cost:

Free

Register to watch for FREE

Other Resources
ESO Surveyors construction boom webinar
Leading Through a Construction Boom: Building a High-Performing Survey Team in a Skills Shortage
Read resource →
Delivering Victoria’s Largest Tunnel Project
Delivering Victoria’s Largest Tunnel Project
Read resource →
Advancing Digitalisation in the Geospatial Industry
Advancing Digitalisation in the Geospatial Industry
Read resource →